top of page
PCL ENERGY
SUNCOR TERMINAL PROJECT



Summary
-
The Suncor Burrard Products Terminal issituated on 430 acres of land of which 175 acresare used for terminal operations.
-
The Upper Terminal, located in Port Moody, contains the fuel processing units, main tank farm and the fuel blending facilities.
-
The Middle Terminal is located on the south side of the Barnet Highway in Burnaby. It contains the secondary tank farm and truck facilities.
-
The Lower Terminal is located in Burnaby, Port Moody and along the Burrard Inlet. It contains the marine and rail facilities. Gasoline, diesel, jet fuel, ethanol, and bio-diesel arrive at the terminal via pipeline, marine tankers, trucks and rail.
Location
Port Moody, BC
Development Years
2019 - 2021
Client
Suncore Energy
Scope of Work
Forming Work



bottom of page
